cms.c2sgmbh/.claude/commands/gsd/audit-milestone.md
Martin Porwoll 77f70876f4 chore: add Claude Code config, prompts, and tenant setup scripts
- Add .claude/ configuration (agents, commands, hooks, get-shit-done workflows)
- Add prompts/ directory with development planning documents
- Add scripts/setup-tenants/ with tenant configuration
- Add docs/screenshots/
- Remove obsolete phase2.2-corrections-report.md
- Update pnpm-lock.yaml
- Update detect-secrets.sh to ignore setup.sh (env var usage, not secrets)

Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
2026-01-18 10:18:05 +00:00

7 KiB

name description argument-hint allowed-tools
gsd:audit-milestone Audit milestone completion against original intent before archiving [version]
Read
Glob
Grep
Bash
Task
Write
Verify milestone achieved its definition of done. Check requirements coverage, cross-phase integration, and end-to-end flows.

This command IS the orchestrator. Reads existing VERIFICATION.md files (phases already verified during execute-phase), aggregates tech debt and deferred gaps, then spawns integration checker for cross-phase wiring.

<execution_context>

</execution_context>

Version: $ARGUMENTS (optional — defaults to current milestone)

Original Intent: @.planning/PROJECT.md @.planning/REQUIREMENTS.md

Planned Work: @.planning/ROADMAP.md @.planning/config.json (if exists)

Completed Work: Glob: .planning/phases//-SUMMARY.md Glob: .planning/phases//-VERIFICATION.md

1. Determine Milestone Scope

# Get phases in milestone
ls -d .planning/phases/*/ | sort -V
  • Parse version from arguments or detect current from ROADMAP.md
  • Identify all phase directories in scope
  • Extract milestone definition of done from ROADMAP.md
  • Extract requirements mapped to this milestone from REQUIREMENTS.md

2. Read All Phase Verifications

For each phase directory, read the VERIFICATION.md:

cat .planning/phases/01-*/*-VERIFICATION.md
cat .planning/phases/02-*/*-VERIFICATION.md
# etc.

From each VERIFICATION.md, extract:

  • Status: passed | gaps_found
  • Critical gaps: (if any — these are blockers)
  • Non-critical gaps: tech debt, deferred items, warnings
  • Anti-patterns found: TODOs, stubs, placeholders
  • Requirements coverage: which requirements satisfied/blocked

If a phase is missing VERIFICATION.md, flag it as "unverified phase" — this is a blocker.

3. Spawn Integration Checker

With phase context collected:

Task(
  prompt="Check cross-phase integration and E2E flows.

Phases: {phase_dirs}
Phase exports: {from SUMMARYs}
API routes: {routes created}

Verify cross-phase wiring and E2E user flows.",
  subagent_type="gsd-integration-checker"
)

4. Collect Results

Combine:

  • Phase-level gaps and tech debt (from step 2)
  • Integration checker's report (wiring gaps, broken flows)

5. Check Requirements Coverage

For each requirement in REQUIREMENTS.md mapped to this milestone:

  • Find owning phase
  • Check phase verification status
  • Determine: satisfied | partial | unsatisfied

6. Aggregate into v{version}-MILESTONE-AUDIT.md

Create .planning/v{version}-v{version}-MILESTONE-AUDIT.md with:

---
milestone: {version}
audited: {timestamp}
status: passed | gaps_found | tech_debt
scores:
  requirements: N/M
  phases: N/M
  integration: N/M
  flows: N/M
gaps:  # Critical blockers
  requirements: [...]
  integration: [...]
  flows: [...]
tech_debt:  # Non-critical, deferred
  - phase: 01-auth
    items:
      - "TODO: add rate limiting"
      - "Warning: no password strength validation"
  - phase: 03-dashboard
    items:
      - "Deferred: mobile responsive layout"
---

Plus full markdown report with tables for requirements, phases, integration, tech debt.

Status values:

  • passed — all requirements met, no critical gaps, minimal tech debt
  • gaps_found — critical blockers exist
  • tech_debt — no blockers but accumulated deferred items need review

7. Present Results

Route by status (see <offer_next>).

<offer_next> Output this markdown directly (not as a code block). Route based on status:


If passed:

✓ Milestone {version} — Audit Passed

Score: {N}/{M} requirements satisfied Report: .planning/v{version}-MILESTONE-AUDIT.md

All requirements covered. Cross-phase integration verified. E2E flows complete.

───────────────────────────────────────────────────────────────

▶ Next Up

Complete milestone — archive and tag

/gsd:complete-milestone {version}

/clear first → fresh context window

───────────────────────────────────────────────────────────────


If gaps_found:

⚠ Milestone {version} — Gaps Found

Score: {N}/{M} requirements satisfied Report: .planning/v{version}-MILESTONE-AUDIT.md

Unsatisfied Requirements

{For each unsatisfied requirement:}

  • {REQ-ID}: {description} (Phase {X})
    • {reason}

Cross-Phase Issues

{For each integration gap:}

  • {from} → {to}: {issue}

Broken Flows

{For each flow gap:}

  • {flow name}: breaks at {step}

───────────────────────────────────────────────────────────────

▶ Next Up

Plan gap closure — create phases to complete milestone

/gsd:plan-milestone-gaps

/clear first → fresh context window

───────────────────────────────────────────────────────────────

Also available:

  • cat .planning/v{version}-MILESTONE-AUDIT.md — see full report
  • /gsd:complete-milestone {version} — proceed anyway (accept tech debt)

───────────────────────────────────────────────────────────────


If tech_debt (no blockers but accumulated debt):

Milestone {version} — Tech Debt Review

Score: {N}/{M} requirements satisfied Report: .planning/v{version}-MILESTONE-AUDIT.md

All requirements met. No critical blockers. Accumulated tech debt needs review.

Tech Debt by Phase

{For each phase with debt:} Phase {X}: {name}

  • {item 1}
  • {item 2}

Total: {N} items across {M} phases

───────────────────────────────────────────────────────────────

▶ Options

A. Complete milestone — accept debt, track in backlog

/gsd:complete-milestone {version}

B. Plan cleanup phase — address debt before completing

/gsd:plan-milestone-gaps

/clear first → fresh context window

─────────────────────────────────────────────────────────────── </offer_next>

<success_criteria>

  • Milestone scope identified
  • All phase VERIFICATION.md files read
  • Tech debt and deferred gaps aggregated
  • Integration checker spawned for cross-phase wiring
  • v{version}-MILESTONE-AUDIT.md created
  • Results presented with actionable next steps </success_criteria>